News Flash Home
The original item was published from 8/23/2017 10:33:00 AM to 8/23/2017 12:37:31 PM.

News Flash

News for San Gabriel

Posted on: August 22, 2017

[ARCHIVED] City to install filters on 426 catch basins

DSC09971_web

Soon, 426 catch basins in the city will be retrofitted with new filter screens that will prevent trash from entering into the storm water system. Known as connector pipe screens, these screens will be placed in front of large storm water drainage pipes that lead into the Los Angeles River.

“The city owns approximately 60 catch basins,” Patty Peña, Management Analyst for the city’s Public Works department, notes. “During the last fiscal year, we installed screens on these catch basins that prevented trash from flowing through.”

To protect the environment, the state has created a permit that regulates the amount of discharge that emanates from storm water systems. This discharge – known as the total maximum daily load – is the amount of pollutant that a given body of water can handle while still meeting water quality standards. 


cps

A look at a pipe connector screen at Abbott and Bencamp inside a catch basin


While San Gabriel has successfully fulfilled the state’s mandate when it comes to city-owned catch basins, officials at Public Works also need to ensure that all Los Angeles County-owned catch basins are retrofitted as well. “Phase one was completed, and all city-owned catch basins have been retrofitted. However, the city’s scope also includes catch basins owned by the county since they convey runoff generated within our city. Phase two will address this.”

As part of the retrofitting process, contractors will be installing new filter screens on 426 catch basins across the city. These screen frames surround the drain, allowing trash to accumulate inside the catch basin instead of flowing into the system. From there, workers can clean the trash on a periodic basis. “Depending on the season – whether it’s wet or dry – you’ll have someone access the drainage system to clean out the trash,” Peña said. “Its then weighed for record keeping.”

Despite the fairly large amount of connector pipe screens required for this project, officials anticipate that construction should move along fairly quickly. Once complete, the city will be able to reduce its total maximum daily load, thereby helping the environment by preventing trash from flowing into the ocean. “Even though we’re further away from the beach, we have the same impact on our waterways as coastal communities,” Peña notes. “It’s our responsibility to ensure that trash doesn’t flow down the system since everything eventually leads to the ocean.”

Facebook Twitter Email

Other News in News for San Gabriel

City Hall (News Flash)

Lunar New Year Festival 2023 Statement

Posted on: January 27, 2023
Del Mar Sewer

Update on Del Mar Ave Sewer Project

Posted on: January 5, 2023
Holiday Tree Lighting (News Flash)

Holiday Tree Lighting on December 6

Posted on: November 28, 2022
Business License Renewals (News Flash)

2023 Business License Renewals

Posted on: November 22, 2022
SOTC (News Flash)

State of the City Address on November 17

Posted on: October 31, 2022
Election (News Flash)

View Live Election Results

Posted on: November 8, 2022
Fall Fun

Ready, Set, Ghoul!

Posted on: October 20, 2022
Emergency Preparedness Month

September is National Preparedness Month

Posted on: September 20, 2022
Compost Day - Athens Services (1)

Free Compost Giveaway on May 7

Posted on: May 3, 2022
Aldo Cervantes Appointed Community Development Director of San Gabriel

New Community Development Director

Posted on: October 14, 2021
Stormwater Projects Along Adelyn and Hermosa To Begin in May

Stormwater Projects To Begin in May

Posted on: April 26, 2021